Salerno – Reggio Calabria Motorway Megalot N.2

Commissioned by: ANAS SpA

Objectives

Modernisation and upgrade of the highway to type 1/A of CNR/80 regulations. Planimetric optimization of the section and adaptation of the route: sometimes maintaining the original configuration in some stretches and widening the road bed where this passes through tunnels or over viaducts or roadways.



Gallery Video

2008 - In progress

Modernisation and upgrade of the Highway to type 1/A of CNR/80 megalot 2

Consorzio Stabile SIS (INC 50,9%)

€ 868.974 Mln

31 Km lenght
12 natural tunnels (10 Twin-tube tunnels + 2 Single-tube tunnels)
5 artificial tunnels
33 (x2) Viaducts (11,483 m length)
2 flyovers

Video Gallery

Made with love by DRTADV