Salerno – Reggio Calabria Motorway Macro-lot 2

Commissioned by: ANAS SpA

Objectives

Modernization and upgrade of the motorway to type 1/A of CNR/80 regulations. Planimetric and altimetric optimization of the road layout: keeping the original configuration in some stretches and widening the road way where this passes through tunnels or over viaducts or embankments.



Gallery Video

2008 - 2014

Modernization and upgrade of the motorway regulations to type 1/A of CNR/80 megalot 2

Consorzio Stabile SIS (INC 50,9%)

€ 869 M

31 Km of total lenght
12 natural tunnels (10 Twin-tube tunnels + 2 Single-tube tunnels)
5 artificial tunnels
33 (x2) Viaducts (11,483 m of length)
2 flyovers

Video Gallery

Next Project

Made with love by DRTADV