Construction contracts
Client ANAS SpA
Construction is scheduled to begin in 2025.
The main route of the intervention has a total length of approximately 6.600 meters starting from the intersection between the existing SS 38 with the Villa di Tirano roundabout, crosses the Adda river and runs alongside it on the hydraulic left up to the Campone terminal roundabout.
The municipalities crossed by the route are:
Bianzone, Villa di Tirano and Tirano, in the province of Sondrio.
The road section to be built corresponds to the «C1» category and is composed of a single carriageway with two lanes of 3,75 meters each and 1,5 meter side shoulders.
The main works of art consist of:
YEAR OF COMPLETION
AMOUNT
OBJECT
Track
Municipalities concerned
Three-span bridge
Two-span bridge
Artificial tunnel
Natural gallery
Underpass
Undergo
Flush intersections
Sections of new roads